- Heto Lifting Solutions
- We strive to be one of the top in building suspended platform gondola system provider.
Home>Products>ZLP630 suspended platform>Aluminum 220V 60HZ electric ZLP630 ZLP800 hanging scaffolding
Aluminum 220V 60HZ electric ZLP630 ZLP800 hanging scaffolding
suspended platform
- China
- ISO, CE
- 1 set suspended platform
- USD1500-2100/sets
- suspended platform will be package by plywood case,then by pallet.One 20' container can put ab
- 7 days
- L/C,T/T,Western Union
- 50 sets per month
- Anica Li2020-07-10 09:46:19
Welcome to my shop! Glad to serve you! Please send your question!
Product Details
Suspended platform: | Painting steel, galvanzied steel, aluminium | Rated load: | 630kg | Platform length: | 8.3 meters |
Hoist motor: | LTD63 | Motor: | 1.5kw | Wire rope: | 8.6mm |
Voltage: | 220V, 380V, 415V | Frequency: | 50HZ, 60HZ | Phase: | 3 Phase, Single Phase |
Product name: | Suspended platform |
Product Description
Aluminum 220V 60HZ electric ZLP630 ZLP800 hanging scaffolding
Suspended Platform Systems provide temporary access to heights – for building maintenance, at construction sites or in industrial environments. The Suspended Platform Systems is modular, which are incredibly easy to assemble, allowing multiple configurations.
The lightweight material is very strong and reliable. It will take you to great heights, safely. It is the best system for maintenance and renovation jobs.
All of the individual components are easy to assemble and dismantle. The components are compact to store and easy to transport. It is available with end and walk-through stirrups. The end stirrups are mounted at the ends of the suspended platform. By using walk-through stirrups you can extend that length as per request. Walk-through stirrups are used if the length of the entire suspended platform exceeds the length between the ropes/hoists.
Specification of ZLP800 suspended platform
Model Suspended Platform | ZLP500 |
ZLP630 |
ZLP800 | ZLP1000 |
Rated load | 640kg | 630kg | 800kg | 1000kg |
Lifting speed | 9-10m/min | 9-10m/min | 8-9m/min | 8m/min |
Length of working platform | 5 meters | 6 meters | 7.5 meters | 7.5 meters |
Hoist motor | LTD6.3 | LTD6.3 | LTD8.0 | LTD10 |
Motor power | 2*1.5kw | 2*1.5kw | 2*1.8kw | 2*2.2KW |
Steel wire rope | 8.3mm | 8.3mm | 8.6mm | 9.1mm |
Cable | 100m | 100m | 100m | 100m |
Lifting height | 100m | 100m | 100m | 100m |
Counter weight | 25*40pcs | 25*40pcs | 25*40pcs | 25*40pcs |
Regular access suspended platform
1). The working platform is modular as 1m, 1.5m,2m and 3m,
2). The working height can be adjusted as per request.
3). The voltage can be 220V,380V,415V, etc.
Package and Delivery of suspended platform
After-sales Services
1.The construction equipment we offer enjoys one-year guarantee period..
2. We supply free quick-wear parts.
3. Double hot lines for 24-hour after-sales services.
4. Online after-sales service is available as well.
5. The technical documents will be attached with the equipment while leaving the factory.
6. If needed, we will send one technician to the site to provide guidance on installation
and debugging as well as the training of operators.
7.We can provide on-site service in some countries and areas where we have overseas office or
agents.
In addition, OEM service is available.
More details, please contact anicali@hrgondola.com or Whatsapp: 0086 15226677167
Contact Us
- Heto Lifting Solutions
- Emailanicali@hrgondola.com
- AddressLangfang, Hebei, China
- Phone(Working Time)0086 15226677167
- WhatsApp0086 15226677167
Related News
Steel wire rope 8.3mm, 8.6mm, 9.1mm for suspended platform |
Aluminum ZLP800 construction motorized gondola to Philippines |
Aluminum ZLP630 suspended platform to Nigeria |
Product Categories
New Products
- Galvanized steel ZLP630 suspended gondola platform for facade cleaning
- Aluminum 6m building cradle for facade cleaning with counter weight
- Aluminum ZLP630 ZLP800 electric hanging platform with counter weight
- 220V three phase temporary suspended scaffolding platform for building
- Aluminum suspended cradle ZLP630 for building maintenance